Concession Agreement Power Plant

Concession agreement for the design, design, operation, maintenance and management of a hydroelectric power generation facility for the use of devices and equipmentThe private public union in the field of energy requires a number of agreements to define the relationships between the various stakeholders. You will find a complete description of the most important relationships under concession, Build-Operate-Transfer, Design-Build-Build-Operate. This section examines agreements specific to an energy project. MERNA, A. and SMITH, N.J. (1994), “Concession contracts for power generation,” Engineering, Construction and Architectural Management, Vol. doi.org/10.1108/eb020990 The dealer must hold a transitional license for nominal production capacity before or at the date of signing the contract. The dealer must obtain a water licence. The dealer must obtain a permanent authorization before or on the reference date of the planned commercial operation.

(Annex 1) Parties may decide to terminate or continue the agreement on revised terms following 120-day NATURAL FM events. In the probability of an FM political event, the parties are required to consult with each other for up to 90 days in order to reach agreement on the measures to be taken to deal with the effects of the FM event. (Article 1, point 1.24) Water concession agreement for the construction of small hydroelectric power plants for electricity Generation._ draft concession agreement for the design, design, operation, maintenance and management of a hydroelectric power plant with related facilities and equipment in the Balkan region. Events that constitute the dealer`s failure include the absence of a performance guarantee, the non-possession of a generic license or water use on or before the date specified in the agreement, or the obligation to transfer the concession to another company without prior government authorization. (Article 2, point 2.1) If the parties are unable to reach an agreement within 90 days of an FM political event, the dealer has the right to terminate the contract. (Article 1, point 1.26) Experience Since coming into force (including possible changes) / whether the draft form has been applied or not: . English: Macedonia Water Concession Agreement.pdf The concessionaire is responsible for all costs and allowances for the acquisition of land, including the expropriation of private land for the completion of the facility. (Article 1, point 1.10) In good faith, it is necessary for the parties to fulfil their obligations pending the resolution of disputes. (Article 5, point 5.4) Duration: twenty years after the issuance of the generation license. (Article 1, point 1.6) The dealer has the exclusive right to manage, operate, operate and maintain a rated power hydroelectric generation facility with associated devices and equipment, including generators, turbines and water transport systems, transformers, crushers, etc.

Esta entrada fue publicada en Sin categoría. Guarda el enlace permanente.